Constructed Wetland Plan Illustration
Site Plan Illustration
 
 
Thousands of plugs of wetland grasses, sedges and herbaceous plants were installed in the constructed wetland.
 
 
 
 
PICP Walks Shown in Construction Allow Stormwater to Percolate  through an underlying Gravel Layer and into the Soil.
 
Green Infrastructure Demonstration Project
Bard College
Annandale-on-Hudson, NY

Restaino Design was instrumental in creating the site plan and landscape design for this ambitious green infrastructure project at the Bard College campus in New York’s Hudson valley. The project addresses stormwater runoff from a 10 acre campus watershed and includes 800 linear feet of permeable interlocking concrete paver (PICP) walks, a porous asphalt parking lot, two bioretention areas, a bioswale, vegetated swale and a constructed wetland with pedestrian path and stone weir wall.

These installations provide students and visitors educational opportunities to study the ability of green infrastructure to capture and cleanse stormwater, enhance biodiversity and prevent downstream flooding. Construction has been completed during the fall of 2014.